refactor: optimize workflow templates and prompt structures

- Streamlined analysis templates (architecture, pattern, performance, quality, security)
- Simplified development templates (component, debugging, feature, refactor, testing)
- Optimized documentation templates (api, folder-navigation, module-readme, project-architecture, project-examples, project-readme)
- Enhanced planning templates (concept-eval, migration, task-breakdown)
- Improved verification templates (codex-technical, cross-validation, gemini-strategic)
- Updated claude-module-unified memory template
- Refined workflow-architecture documentation

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
This commit is contained in:
catlog22
2025-10-16 13:48:35 +08:00
parent e95be40c2b
commit 39a35c24b1
26 changed files with 693 additions and 1402 deletions

View File

@@ -1,52 +1,27 @@
Strategic validation of workflow implementation plan from architectural and business perspective:
Validate the strategic and architectural soundness of a workflow implementation plan.
## Required Strategic Analysis:
1. **Architectural Soundness Assessment**
- Evaluate overall system design coherence
- Assess component interaction patterns
- Validate architectural decision consistency
- Identify potential design conflicts or gaps
## CORE CHECKLIST ⚡
□ Evaluate the plan against high-level system architecture
□ Assess the logic of the task breakdown and dependencies
□ Verify alignment with stated business objectives and success criteria
□ Identify strategic risks, not just low-level technical ones
2. **Task Decomposition Logic Evaluation**
- Review task breakdown methodology and rationale
- Assess functional completeness of each task
- Evaluate task granularity and scope appropriateness
- Identify missing or redundant decomposition elements
## REQUIRED STRATEGIC ANALYSIS
1. **Architectural Soundness**: Assess design coherence and pattern consistency.
2. **Task Decomposition Logic**: Review task breakdown, granularity, and completeness.
3. **Dependency Coherence**: Analyze task interdependencies and logical flow.
4. **Business Alignment**: Validate against business objectives and requirements.
5. **Strategic Risk Identification**: Identify architectural, resource, and timeline risks.
3. **Dependency Coherence Analysis**
- Map task interdependencies and logical flow
- Validate dependency ordering and scheduling
- Assess circular dependency risks
- Evaluate parallel execution opportunities
## OUTPUT REQUIREMENTS
- **Strategic Assessment Report**: Grades for architecture, decomposition, and business alignment.
- **Detailed Recommendations**: Critical issues, improvements, and alternative approaches.
- **Action Items**: A prioritized list of changes (Immediate, Short-term, Long-term).
4. **Business Alignment Verification**
- Validate alignment with stated business objectives
- Assess stakeholder requirement coverage
- Evaluate success criteria completeness and measurability
- Identify business risk and mitigation adequacy
## VERIFICATION CHECKLIST ✓
□ The plan's architectural soundness has been thoroughly assessed
□ Task decomposition and dependencies are logical and coherent
□ The plan is confirmed to be in alignment with business goals
□ Strategic risks are identified with clear recommendations
5. **Strategic Risk Identification**
- Identify architectural risks and technical debt implications
- Assess implementation complexity and resource requirements
- Evaluate timeline feasibility and milestone realism
- Document potential blockers and escalation scenarios
## Output Requirements:
### Strategic Assessment Report:
- **Architecture Grade** (A-F): Overall design quality assessment
- **Decomposition Grade** (A-F): Task breakdown effectiveness
- **Risk Level** (Low/Medium/High): Combined implementation risk
- **Business Alignment Score** (1-10): Requirement satisfaction level
### Detailed Recommendations:
- **Critical Issues**: Must-fix problems that could cause failure
- **Improvement Opportunities**: Non-blocking enhancements
- **Alternative Approaches**: Strategic alternatives worth considering
- **Resource Implications**: Staffing and timeline considerations
### Action Items:
- **Immediate**: Changes needed before implementation starts
- **Short-term**: Improvements for early phases
- **Long-term**: Strategic enhancements for future iterations
Focus on high-level strategic concerns, business alignment, and long-term architectural implications. Provide actionable recommendations with clear rationale and priority levels.
Focus: High-level strategic concerns, business alignment, and long-term architectural implications.