- Introduced Phase 6: TDD Structure Validation to ensure compliance with TDD workflow standards, including task structure validation, dependency checks, and user configuration verification.
- Implemented Phase 7: TDD Verification for full compliance checks, including task chain structure validation, coverage analysis, and TDD cycle verification.
- Generated detailed TDD compliance reports with quality gate recommendations based on objective criteria.
- Added documentation for new commands and workflows in the Claude Commands index.
Add Phase 6 to both synthesis.md and design-sync.md to automatically
update context-package.json when artifacts are modified, preventing
stale cache issues when transitioning to /workflow:plan.
Changes:
- synthesis.md: Add Phase 6 to sync updated role analyses to context-package
- design-sync.md: Add Phase 5 to sync design system refs + role analyses
This ensures:
- synthesis → plan: context-package reflects synthesis enhancements
- ui-design → plan: context-package includes design system references
- No manual context-gather re-run needed after artifact updates
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude <noreply@anthropic.com>
- Deleted the `list` command for design runs.
- Removed the `update` command and its associated documentation.
- Introduced `design-sync` command to synchronize finalized design system references to brainstorming artifacts.
- Updated command references in `COMMAND_REFERENCE.md`, `GETTING_STARTED.md`, and `GETTING_STARTED_CN.md` to reflect the new command structure.
- Ensured all related documentation and output styles are consistent with the new command naming and functionality.