Commit Graph

3 Commits

Author SHA1 Message Date
catlog22
65763c76e9 Add TDD Structure Validation and Verification Phases with Comprehensive Reporting
- Introduced Phase 6: TDD Structure Validation to ensure compliance with TDD workflow standards, including task structure validation, dependency checks, and user configuration verification.
- Implemented Phase 7: TDD Verification for full compliance checks, including task chain structure validation, coverage analysis, and TDD cycle verification.
- Generated detailed TDD compliance reports with quality gate recommendations based on objective criteria.
- Added documentation for new commands and workflows in the Claude Commands index.
2026-02-28 20:41:06 +08:00
catlog22
7aa1038951 refactor: spec-generator outputs from monolithic files to directory structure
Requirements, architecture, and epics now output as directories with
individual files per design point (_index.md + REQ-*.md/ADR-*.md/EPIC-*.md),
linked via relative paths for better referencing and downstream consumption.
Phase 6 handoff bridge simplified to read directly from individual EPIC files.
2026-02-11 17:24:18 +08:00
catlog22
8475a724ae feat: add spec-generator handoff bridge to workflow:plan consumption pipeline
Phase 6 now creates brainstorm_artifacts-compatible bridge files
(.brainstorming/guidance-specification.md, feature-index.json, feature-specs)
when handing off to workflow:plan or req-plan, enabling context-search-agent
auto-discovery without modifying downstream consumers.
2026-02-11 16:30:07 +08:00